Back To Projects

Case Studies

Case Studies

Pepsico Epicentre

Chembur/18 Months/Pepsico
Pepsico Epicentre thumbnail

Client

Pepsico

Scope

Extension of 6 Floors with Structural & Civil Work

Duration

18 Months

Project Overview

This project involved the vertical expansion of an existing commercial structure, adding six additional floors at the Pepsico Epicentre building in Chembur. The scope included structural fabrication and civil works within an active building environment.

The Challenge

Extending an operational building required precise structural integration without compromising the stability of the existing framework. Managing load distribution, alignment, and execution within a functioning facility added significant complexity.

Our Solution

A detailed structural strategy was developed to ensure seamless integration between the new and existing systems. The solution focused on phased vertical expansion, controlled load transfer, and maintaining operational continuity throughout the project.

Execution

The extension works were carried out in stages, with structural steel fabrication and civil construction executed in coordination with engineering specifications. Continuous monitoring ensured alignment, stability, and sequencing discipline across all levels.

Result

The building was successfully expanded, increasing its functional capacity while maintaining structural integrity. The completed work demonstrates precision in vertical expansion within constrained operational environments.